Sheet PM-015 · Planned and preventive maintenance · Free template
Electric Boiler Maintenance Checklist (free template)
The Electric Boiler Maintenance Checklist gives every technician the same order of work: 8 sections, 41 questions, and an owner for each deficiency.
Every PPM task done, signed and on file before the client asks.
What it covers
41 questions across 8 sections. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Safety and Isolation
- Section 2: Visual Inspection and General Condition
- Section 3: Heating Elements
- Section 4: Electrical Systems and Controls
- Section 5: Safety Devices and Protection
- Section 6: Water Quality and System Condition
- Section 7: Pumps and Pipework
- Section 8: Documentation and Reinstatement
When to use it
Use it on the service cycle the manufacturer sets, and after any breakdown, leak or noise complaint. With 41 questions, it is worth doing properly once rather than quickly twice: walk it in order and photograph as you go.
8 sections, from Safety and Isolation through to Documentation and Reinstatement. The app shows the page you are on and how many are left as you go.
Who uses it
In-house maintenance teams and service contractors use it; the owner sees the report. Clients read it at the monthly or quarterly review; contract managers use it to show the SLA was met.
Before you walk it
- Type readings (temperatures, pressures, currents) into the number answers where the checklist asks, so the next service can compare.
- Photograph filters before and after changing them.
- Work offline in plant rooms and risers, then share the PDF once you are back in signal.
- Use the client’s words: rename Issue to Deficiency in the app, so the report matches the contract.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Electric Boiler Maintenance Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.
Walk it
Work through the 8 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.
Questions people ask
How often should the Electric Boiler Maintenance Checklist be done?
On the service cycle the manufacturer and your maintenance plan set for this equipment, and after any fault. The checklist records each service; it doesn’t set the cycle.
Can the app schedule PPM visits?
Not yet. Automations for scheduling and reminders are on the roadmap. Today your PPM schedule says when a visit is due, and the checklist in the Easy Site Audit app records it.
Can I change the questions in the Electric Boiler Maintenance Checklist?
Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.
Make the next walk-round the one nobody can question.
Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.