Boiler Commissioning Checklist (free template)

The Boiler Commissioning Checklist gives every technician the same order of work: 8 sections, 40 questions, and an owner for each deficiency.

Every PPM task done, signed and on file before the client asks.

What it covers

8 sections and 40 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: General Inspection
  2. Section 2: Controls
  3. Section 3: All Systems
  4. Section 4: Central Heating Mode
  5. Section 5: Combination Boilers
  6. Section 6: Domestic Hot Water Mode
  7. Section 7: Condensing Boilers
  8. Section 8: All Installations
ChecklistBoiler Commissioning Checklist
StagePlanned and preventive maintenance
LaneFacilities and maintenance teams
Sections8
Questions40
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Aug 30, 2024
PriceFree on every plan

When to use it

Use it when the system is installed and ready to run, before the owner or operator accepts it. At 40 questions, plan it as one sitting on site, not a quick tick on the way past.

The 8 sections run from General Inspection to All Installations, and the app’s Jump to section list takes you straight to any of them.

Who uses it

Commissioning agents, MEP contractors and the installer’s engineers complete it; the owner’s team and the facilities manager receive it. Clients read it at the monthly or quarterly review; contract managers use it to show the SLA was met.

Before you walk it

  • Type readings into the number answers where the checklist asks, so the report shows the values, not just a tick.
  • Photograph the rating plate and the controls display at the time of each test.
  • Use the client’s words: rename Issue to Deficiency in the app, so the report matches the contract.
  • Leave the checklist section out of the report when the client wants only the deficiencies.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Boiler Commissioning Checklist in the Easy Site Audit app and add it to a project: usually a site, an asset or a walk-round. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 8 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running PPM across several sites? Book a demo and see how a team runs these checklists as one maintenance program.

Questions people ask

Does the Boiler Commissioning Checklist replace the commissioning specification?

No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.

How often should the Boiler Commissioning Checklist be done?

On the cycle your PPM schedule sets for this asset, which usually comes from the manufacturer, the contract or the insurer. The checklist records each visit; it doesn’t set the cycle.

Can I change the questions in the Boiler Commissioning Checklist?

Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.

Make the next walk-round the one nobody can question.

Pick the checklist, walk the site, give every deficiency an owner and send the client a signed report.

Start freeon iPhone and iPad
Start freeon iPhone and iPad