Sheet HC-007 · Handover and closeout · Free template

Maintenance Punch List (free template)

Use it on the pre-handover walk, the re-inspection and the final sign-off, so all three reports ask the same 38 questions in the same order.

Closeout signed. Final payment and retainage released.

What it covers

The Maintenance Punch List runs to 7 sections and 38 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Exterior & Grounds Maintenance
  2. Section 2: Building Envelope & Common Areas
  3. Section 3: Unit Interior & Living Spaces
  4. Section 4: Electrical & Lighting
  5. Section 5: Plumbing & Moisture Control
  6. Section 6: Mechanical & HVAC
  7. Section 7: Fire, Life Safety & Security
ChecklistMaintenance Punch List
StageHandover and closeout
LaneBuilders and contractors
Sections7
Questions38
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Mar 31, 2026
PriceFree on every plan

When to use it

Use it on every unit or room before the owner’s walk, so the owner finds nothing you didn’t. 38 questions makes a focused inspection: long enough to cover the job properly, short enough to finish in one visit.

7 sections, from Exterior & Grounds Maintenance through to Fire, Life Safety & Security. The app shows the page you are on and how many are left as you go.

Who uses it

Superintendents and project managers walk it first; the owner’s representative or the architect often walks it again at closeout. The PDF is what the owner’s side reads before releasing the final payment, so it carries your logo and your photos, with no watermark.

Before you walk it

  • Rename Issue to Punch item in the app, so the report uses the owner’s words.
  • Put the room and the trade in each punch item’s title, so the report reads the way the trades work.
  • Photograph the whole wall as well as the close-up. The trade needs to find the item, not just see it.
  • Put the location in each item’s title: “Unit 4B, bedroom 2, door binds on frame”. Issues have no separate location field, so the title carries it.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Maintenance Punch List in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 7 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

What goes on a punch list?

Anything that doesn’t meet the contract at closeout: damaged or unfinished finishes, missing hardware, fixtures that don’t work, and cleaning. Most items are finishes such as paint, caulk, trim and doors.

Does a signed handover report prove the work is complete?

It records what was inspected, what was found and what was closed, with timestamped photos and your signature. It is evidence for the conversation with the client, not a certificate of completion or compliance.

Does the Maintenance Punch List work offline?

Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.

Start freeon iPhone and iPad
Start freeon iPhone and iPad