Sheet HC-013 · Handover and closeout · Free template

Project Handover Checklist (free template)

7 sections, 32 questions and a signed PDF at the end: the Project Handover Checklist turns the closeout walk into a record you can show the client item by item.

Closeout signed. Final payment and retainage released.

What it covers

The Project Handover Checklist runs to 7 sections and 32 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Management
  2. Section 2: Finishing-off / Remedial Works
  3. Section 3: Performance
  4. Section 4: Site Installation Removal
  5. Section 5: Management / Disposal of Wastes
  6. Section 6: Management / Removal of Materials
  7. Section 7: Any Pollution / Contaminated Land Remediation Issues
ChecklistProject Handover Checklist
StageHandover and closeout
LaneBuilders and contractors
Sections7
Questions32
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Jun 14, 2024
PriceFree on every plan

When to use it

Use it in the weeks before handover, while there is still time to close what it finds, and again on the day. 32 questions makes a focused inspection: long enough to cover the job properly, short enough to finish in one visit.

The 7 sections run from Management to Any Pollution / Contaminated Land Remediation Issues, and the app’s Jump to section list takes you straight to any of them.

Who uses it

Project managers and site managers run it; the client, the operator or the facilities team receives it. Project managers read it to see what is still open; the client reads it to see what was fixed.

Before you walk it

  • Agree the checklist with the client before the walk, so handover day has no surprises.
  • Photograph meter readings, serial numbers and the keys handed over. They are the first things asked about later.
  • Put the location in each item’s title: “Unit 4B, bedroom 2, door binds on frame”. Issues have no separate location field, so the title carries it.
  • Give every item to one trade. An item owned by “the contractor” is owned by nobody.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Project Handover Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 7 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

What should a handover report include?

What was inspected, what was found, who owns each open item and when it is due, with photos and a signature. Easy Site Audit puts all of that in one PDF, with the checklist answers after the issues.

Is a punch list the same as a snag list?

Yes. Punch list is the US name and snag list the UK one for the same job: the items to fix before handover. You can rename Issue and Report in the app, so the PDF says punch item or snag, whichever your client uses.

Is the Project Handover Checklist free?

Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.