Sheet QT-023 · Quality and trades · Free template

Piping Pre-Commissioning Checklist (free template)

38 questions across 3 sections, so every inspector checks the same things at the same hold point, whoever is on site that day.

Fewer items on the punch list, because they were caught at the trade.

What it covers

3 sections and 38 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Flooding Spread Set-Up
  2. Section 2: Pipeline Pig Valve Launching Sequence
  3. Section 3: Pipeline Flooding, Pigging, Gauging and Chemical Injection
ChecklistPiping Pre-Commissioning Checklist
StageQuality and trades
LaneBuilders and contractors
Sections3
Questions38
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Sep 17, 2024
PriceFree on every plan

When to use it

Use it after a replacement or major repair, before the system goes back into service. 38 questions gives a full picture of one job without turning it into a day’s work.

The 3 sections split the job into Flooding Spread Set-Up, Pipeline Pig Valve Launching Sequence and Pipeline Flooding, Pigging, Gauging and Chemical Injection.

Who uses it

Commissioning agents, MEP contractors and the installer’s engineers complete it; the owner’s team and the facilities manager receive it. When a client or inspector asks what is behind a finished wall, the photos from this check are the answer.

Before you walk it

  • Raise an action plan for each open item, so acceptance waits on a short list, not a vague one.
  • Type readings into the number answers where the checklist asks, so the report shows the values, not just a tick.
  • Re-inspect with the same checklist and keep both reports. Together they show the defect and the fix.
  • Photograph every cavity before it is closed, even when it is right. The photo of a correct install is the one you will need later.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Piping Pre-Commissioning Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 3 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Does the Piping Pre-Commissioning Checklist replace the commissioning specification?

No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.

How does a trade contractor get their items?

Send them the PDF report. Each item carries its photos and its action plan, with the priority and the due date. A shared team workspace is on the roadmap; today the report is how the trade gets the list.

Is the Piping Pre-Commissioning Checklist free?

Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.