Transformer Commissioning Checklist (free template)

Catch it at the trade, not on the punch list: 40 questions across 12 sections, with photos of the work before it disappears behind the next trade.

Fewer items on the punch list, because they were caught at the trade.

What it covers

12 sections and 40 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Transformer Pre-Installation
  2. Section 2: Site Preparation
  3. Section 3: Equipment & Tools
  4. Section 4: Safety Measures
  5. Section 5: Transformer Arrival & Inspection
  6. Section 6: Pre-Installation Tests
  7. Section 7: Transformer Erection
  8. Section 8: Testing
  9. Section 9: Commissioning
  10. Section 10: Documentation
  11. Section 11: Maintenance and Monitoring
  12. Section 12: Oil Analysis
ChecklistTransformer Commissioning Checklist
StageQuality and trades
LaneBuilders and contractors
Sections12
Questions40
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Sep 4, 2024
PriceFree on every plan

When to use it

Use it when the system is installed and ready to run, before the owner or operator accepts it. 40 questions makes a focused inspection: long enough to cover the job properly, short enough to finish in one visit.

The 12 sections run from Transformer Pre-Installation to Oil Analysis, and the app’s Jump to section list takes you straight to any of them.

Who uses it

Commissioning agents, MEP contractors and the installer’s engineers complete it; the owner’s team and the facilities manager receive it. The report goes to the trade contractor with each defect assigned, and into the project quality file.

Before you walk it

  • Photograph the rating plate and the controls display at the time of each test.
  • Raise an action plan for each open item, so acceptance waits on a short list, not a vague one.
  • Open an action plan on every answer that needs fixing, with a due date, so the re-check happens before the next trade arrives.
  • Draw a dimension line on the photo with the measure tool, so the trade sees the size of the gap, not just the word “gap”.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Transformer Commissioning Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 12 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Does the Transformer Commissioning Checklist replace the commissioning specification?

No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.

How does a trade contractor get their items?

Send them the PDF report. Each item carries its photos and its action plan, with the priority and the due date. A shared team workspace is on the roadmap; today the report is how the trade gets the list.

Can I change the questions in the Transformer Commissioning Checklist?

Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.