Sheet HC-012 · Handover and closeout · Free template

Project Commissioning Checklist (free template)

Use it on the pre-handover walk, the re-inspection and the final sign-off, so all three reports ask the same 17 questions in the same order.

Closeout signed. Final payment and retainage released.

What it covers

17 questions across 2 sections. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Valuable Elements
  2. Section 2: Success Factors
ChecklistProject Commissioning Checklist
StageHandover and closeout
LaneBuilders and contractors
Sections2
Questions17
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Sep 17, 2024
PriceFree on every plan

When to use it

Use it when the system is installed and ready to run, before the owner or operator accepts it. 17 questions gives a full picture of one job without turning it into a day’s work.

Its 2 sections (Valuable Elements and Success Factors) keep related questions together.

Who uses it

Commissioning agents, MEP contractors and the installer’s engineers complete it; the owner’s team and the facilities manager receive it. The PDF is what the owner’s side reads before releasing the final payment, so it carries your logo and your photos, with no watermark.

Before you walk it

  • Type readings into the number answers where the checklist asks, so the report shows the values, not just a tick.
  • Photograph the rating plate and the controls display at the time of each test.
  • Walk in a fixed order (top floor down, or unit by unit) and keep it the same on every walk, so the re-inspection is a straight comparison.
  • Photograph the whole wall as well as the close-up. The trade needs to find the item, not just see it.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Project Commissioning Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 2 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Does the Project Commissioning Checklist replace the commissioning specification?

No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.

Does a signed handover report prove the work is complete?

It records what was inspected, what was found and what was closed, with timestamped photos and your signature. It is evidence for the conversation with the client, not a certificate of completion or compliance.

Does the Project Commissioning Checklist work offline?

Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.

Start freeon iPhone and iPad
Start freeon iPhone and iPad