Pre-Drywall Inspection Checklist (free template)

Catch it at the trade, not on the punch list: 54 questions across 8 sections, with photos of the work before it disappears behind the next trade.

Fewer items on the punch list, because they were caught at the trade.

What it covers

54 questions across 8 sections. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Pre-Drywall Inspection
  2. Section 2: Electrical
  3. Section 3: Plumbing
  4. Section 4: Sprinkler
  5. Section 5: Hvac
  6. Section 6: Low Voltage
  7. Section 7: Insulation
  8. Section 8: General
ChecklistPre-Drywall Inspection Checklist
StageQuality and trades
LaneBuilders and contractors
Sections8
Questions54
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Jan 23, 2024
PriceFree on every plan

When to use it

Use it as the trade completes each area, so defects are fixed while the trade is still on site. At 54 questions, this is a full inspection. Set time aside for it and walk it in the checklist’s order.

The 8 sections run from Pre-Drywall Inspection to General, and the app’s Jump to section list takes you straight to any of them.

Who uses it

Quality managers and site engineers use it at hold points; the inspector or engineer of record may ask to see it. The report goes to the trade contractor with each defect assigned, and into the project quality file.

Before you walk it

  • Check again with the same checklist after the fix, so the pair of reports shows the defect and the repair.
  • Photograph every cavity or connection before it is covered, even when it is right.
  • Photograph every cavity before it is closed, even when it is right. The photo of a correct install is the one you will need later.
  • Agree the hold points with each trade at the start, so nobody covers work that hasn’t been checked.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Pre-Drywall Inspection Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 8 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Does the Pre-Drywall Inspection Checklist replace the building inspector’s visit?

No. It is your own quality check before the official inspection. Code approval comes from the inspector or the engineer of record.

Does completing the checklist mean the work meets code?

No. The checklist records what was inspected and what was found, with photos. Code approval comes from the building inspector or the engineer of record; the report is your evidence of the checks you made.

Does the Pre-Drywall Inspection Checklist work offline?

Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.

Start freeon iPhone and iPad
Start freeon iPhone and iPad