Construction Quality Control Checklist (free template)
184 questions across 8 sections, so every inspector checks the same things at the same hold point, whoever is on site that day.
Fewer items on the punch list, because they were caught at the trade.
What it covers
8 sections and 184 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Pre-Start Phase
- Section 2: Foundation Phase
- Section 3: Rough Phase
- Section 4: Hvac
- Section 5: Plumbing
- Section 6: Electrical
- Section 7: Pre-Finish Phase
- Section 8: Finish Phase
When to use it
Use it at the hold point, before the work is covered by the next trade. At 184 questions, it is a big checklist. Use the section list to plan the walk, and expect to come back to it more than once.
The 8 sections run from Pre-Start Phase to Finish Phase, and the app’s Jump to section list takes you straight to any of them.
Who uses it
Superintendents, quality managers and trade foremen complete it; the trade contractor owns the defects. When a client or inspector asks what is behind a finished wall, the photos from this check are the answer.
Before you walk it
- Photograph every cavity or connection before it is covered, even when it is right.
- Use the measure tool to show spacing, cover or gaps on the photo.
- Open an action plan on every answer that needs fixing, with a due date, so the re-check happens before the next trade arrives.
- Draw a dimension line on the photo with the measure tool, so the trade sees the size of the gap, not just the word “gap”.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Construction Quality Control Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.
Walk it
Work through the 8 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.
Questions people ask
Does the Construction Quality Control Checklist replace the building inspector’s visit?
No. It is your own quality check before the official inspection. Code approval comes from the inspector or the engineer of record.
Does completing the checklist mean the work meets code?
No. The checklist records what was inspected and what was found, with photos. Code approval comes from the building inspector or the engineer of record; the report is your evidence of the checks you made.
Can I change the questions in the Construction Quality Control Checklist?
Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.
Run the next handover as a program, not a pile of PDFs.
Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.