Sheet QT-001 · Quality and trades · Free template

Air Conditioning Commissioning Checklist (free template)

A ready-made quality check for the moment before this work is covered: 1 section, 14 questions, and 4 photos per question for the evidence.

Fewer items on the punch list, because they were caught at the trade.

What it covers

The Air Conditioning Commissioning Checklist runs to 1 section and 14 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Air Conditioning Checks
ChecklistAir Conditioning Commissioning Checklist
StageQuality and trades
LaneBuilders and contractors
Sections1
Questions14
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Mar 8, 2024
PriceFree on every plan

When to use it

Use it when the system is installed and ready to run, before the owner or operator accepts it. At 14 questions, this is a short check: one pass, done on the spot, easy to repeat as often as the job needs.

Everything sits in one section, Air Conditioning Checks, so the questions run straight through with no jumping about. Facilities and maintenance teams use it too, for the same job on the sites they look after. Property managers use it too, for the same job across their buildings.

Who uses it

Commissioning agents, MEP contractors and the installer’s engineers complete it; the owner’s team and the facilities manager receive it. The report goes to the trade contractor with each defect assigned, and into the project quality file.

Before you walk it

  • Type readings into the number answers where the checklist asks, so the report shows the values, not just a tick.
  • Photograph the rating plate and the controls display at the time of each test.
  • Photograph every cavity before it is closed, even when it is right. The photo of a correct install is the one you will need later.
  • Agree the hold points with each trade at the start, so nobody covers work that hasn’t been checked.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Air Conditioning Commissioning Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work down the questions in order. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Does the Air Conditioning Commissioning Checklist replace the commissioning specification?

No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.

Does completing the checklist mean the work meets code?

No. The checklist records what was inspected and what was found, with photos. Code approval comes from the building inspector or the engineer of record; the report is your evidence of the checks you made.

Is the Air Conditioning Commissioning Checklist free?

Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.

Start freeon iPhone and iPad
Start freeon iPhone and iPad