Sheet QT-026 · Quality and trades · Free template
Pump Commissioning Checklist (free template)
A ready-made quality check for the moment before this work is covered: 1 section, 16 questions, and 4 photos per question for the evidence.
Fewer items on the punch list, because they were caught at the trade.
What it covers
1 section and 16 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Pump Commissioning
When to use it
Use it when the system is installed and ready to run, before the owner or operator accepts it. 16 questions gives a full picture of one job without turning it into a day’s work.
It is a single section, Pump Commissioning: start at the top and work down.
Who uses it
Commissioning agents, MEP contractors and the installer’s engineers complete it; the owner’s team and the facilities manager receive it. The report goes to the trade contractor with each defect assigned, and into the project quality file.
Before you walk it
- Type readings into the number answers where the checklist asks, so the report shows the values, not just a tick.
- Photograph the rating plate and the controls display at the time of each test.
- Open an action plan on every answer that needs fixing, with a due date, so the re-check happens before the next trade arrives.
- Draw a dimension line on the photo with the measure tool, so the trade sees the size of the gap, not just the word “gap”.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Pump Commissioning Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.
Walk it
Work down the questions in order. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.
Questions people ask
Does the Pump Commissioning Checklist replace the commissioning specification?
No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.
Does completing the checklist mean the work meets code?
No. The checklist records what was inspected and what was found, with photos. Code approval comes from the building inspector or the engineer of record; the report is your evidence of the checks you made.
Does the Pump Commissioning Checklist work offline?
Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.
Run the next handover as a program, not a pile of PDFs.
Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.