Residential Drywall Code Compliance Checklist (free template)

A hold-point record for this work: 4 sections, 18 questions, and a signed PDF the next trade can be released against.

Fewer items on the punch list, because they were caught at the trade.

What it covers

18 questions across 4 sections. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Permits and Plans
  2. Section 2: General Nailing and Screwing
  3. Section 3: Water-Resistant Gypsum Backing Board
  4. Section 4: Garage Separation
ChecklistResidential Drywall Code Compliance Checklist
StageQuality and trades
LaneBuilders and contractors
Sections4
Questions18
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Jul 10, 2025
PriceFree on every plan

When to use it

Use it at the hold point, before the work is covered by the next trade. 18 questions makes a focused inspection: long enough to cover the job properly, short enough to finish in one visit.

The 4 sections split the job into Permits and Plans, General Nailing and Screwing, Water-Resistant Gypsum Backing Board and Garage Separation. Property managers use it too, for the same job across their buildings.

Who uses it

Superintendents, quality managers and trade foremen complete it; the trade contractor owns the defects. Project managers use the report to release the next trade; the quality file keeps it for closeout.

Before you walk it

  • Check again with the same checklist after the fix, so the pair of reports shows the defect and the repair.
  • Photograph every cavity or connection before it is covered, even when it is right.
  • Where the checklist asks for a reading or a measurement, type the number in. It prints in the report beside the question.
  • Open an action plan on every answer that needs fixing, with a due date, so the re-check happens before the next trade arrives.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Residential Drywall Code Compliance Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 4 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Does the Residential Drywall Code Compliance Checklist replace the building inspector’s visit?

No. It is your own quality check before the official inspection. Code approval comes from the inspector or the engineer of record.

How does a trade contractor get their items?

Send them the PDF report. Each item carries its photos and its action plan, with the priority and the due date. A shared team workspace is on the roadmap; today the report is how the trade gets the list.

Is the Residential Drywall Code Compliance Checklist free?

Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.

Start freeon iPhone and iPad
Start freeon iPhone and iPad