Construction Site Inspection Checklist (free template)

A hold-point record for this work: 19 sections, 125 questions, and a signed PDF the next trade can be released against.

Fewer items on the punch list, because they were caught at the trade.

What it covers

The Construction Site Inspection Checklist runs to 19 sections and 125 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Site Access
  2. Section 2: Working at Heights
  3. Section 3: Scaffolding
  4. Section 4: Ladders
  5. Section 5: Roof Work
  6. Section 6: Excavations
  7. Section 7: Manual Handling
  8. Section 8: Loading and Unloading Goods
  9. Section 9: Traffic and Vehicles
  10. Section 10: Tools, Machinery, and Plant
  11. Section 11: Hoists
  12. Section 12: Emergencies
  13. Section 13: Fire
  14. Section 14: Hazardous Substances
  15. Section 15: Noise
  16. Section 16: Hand-arm Vibration (HAV)
  17. Section 17: Electricity and Other Services
  18. Section 18: Worker Welfare
  19. Section 19: Protecting the Public
ChecklistConstruction Site Inspection Checklist
StageQuality and trades
LaneBuilders and contractors
Sections19
Questions125
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Mar 18, 2024
PriceFree on every plan

When to use it

Use it at the hold point, when the trade says the work is ready and before the next trade covers it. At 125 questions, this is a major inspection, best planned as its own visit. Answers save on the device as you go, so you can stop and pick it up again.

19 sections cover a lot of ground, from Site Access to Protecting the Public. Walk them in order, or jump to the one you are standing in.

Who uses it

Superintendents, quality managers and site engineers complete it; trade foremen often run it first as a self-check. Project managers use the report to release the next trade; the quality file keeps it for closeout.

Before you walk it

  • Photograph every cavity before it is closed, even when it is right. The photo of a correct install is the one you will need later.
  • Agree the hold points with each trade at the start, so nobody covers work that hasn’t been checked.
  • Where the checklist asks for a reading or a measurement, type the number in. It prints in the report beside the question.
  • Open an action plan on every answer that needs fixing, with a due date, so the re-check happens before the next trade arrives.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Construction Site Inspection Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 19 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Does completing the checklist mean the work meets code?

No. The checklist records what was inspected and what was found, with photos. Code approval comes from the building inspector or the engineer of record; the report is your evidence of the checks you made.

How does a trade contractor get their items?

Send them the PDF report. Each item carries its photos and its action plan, with the priority and the due date. A shared team workspace is on the roadmap; today the report is how the trade gets the list.

Can I change the questions in the Construction Site Inspection Checklist?

Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.

Start freeon iPhone and iPad
Start freeon iPhone and iPad