Mechanical Rough-In Inspection Checklist (free template)

A hold-point record for this work: 18 sections, 119 questions, and a signed PDF the next trade can be released against.

Fewer items on the punch list, because they were caught at the trade.

What it covers

18 sections and 119 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Permits and Plans
  2. Section 2: Forced-Air Furnace
  3. Section 3: Underfloor and Antics
  4. Section 4: Garage
  5. Section 5: Condensing Furnace (High Efficiency)
  6. Section 6: General
  7. Section 7: Return Air
  8. Section 8: Insulation
  9. Section 9: Combustion Air
  10. Section 10: Vents and Connectors
  11. Section 11: Clothes Dryer
  12. Section 12: Range
  13. Section 13: Range Hood
  14. Section 14: Fireplace
  15. Section 15: Air Conditioning
  16. Section 16: Exhaust Venting
  17. Section 17: Whole House Ventilation Systems
  18. Section 18: Energy Code Requirements
ChecklistMechanical Rough-In Inspection Checklist
StageQuality and trades
LaneBuilders and contractors
Sections18
Questions119
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Oct 28, 2023
PriceFree on every plan

When to use it

Use it before the inspector’s visit, so the inspection finds nothing you hadn’t already found. With 119 questions, split the walk by section if you need to. Everything saves on the device, and the app counts what is still to answer.

With 18 sections, from Permits and Plans to Energy Code Requirements, use the app’s Jump to section list rather than scrolling. Property managers use it too, for the same job across their buildings.

Who uses it

Superintendents, quality managers and trade foremen complete it; the trade contractor owns the defects. Project managers use the report to release the next trade; the quality file keeps it for closeout.

Before you walk it

  • Photograph every cavity or connection before it is covered, even when it is right.
  • Use the measure tool to show spacing, cover or gaps on the photo.
  • Agree the hold points with each trade at the start, so nobody covers work that hasn’t been checked.
  • Where the checklist asks for a reading or a measurement, type the number in. It prints in the report beside the question.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Mechanical Rough-In Inspection Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 18 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Does the Mechanical Rough-In Inspection Checklist replace the building inspector’s visit?

No. It is your own quality check before the official inspection. Code approval comes from the inspector or the engineer of record.

How does a trade contractor get their items?

Send them the PDF report. Each item carries its photos and its action plan, with the priority and the due date. A shared team workspace is on the roadmap; today the report is how the trade gets the list.

Can I change the questions in the Mechanical Rough-In Inspection Checklist?

Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.

Start freeon iPhone and iPad
Start freeon iPhone and iPad