Solar Commissioning Checklist (free template)

A hold-point record for this work: 17 sections, 141 questions, and a signed PDF the next trade can be released against.

Fewer items on the punch list, because they were caught at the trade.

What it covers

The Solar Commissioning Checklist runs to 17 sections and 141 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: PV Modules and Module Wiring
  2. Section 2: Mounting Hardware
  3. Section 3: Building Envelope Penetrations
  4. Section 4: DC Source Circuit Junction Box
  5. Section 5: Source Circuit Fused Combiner Box
  6. Section 6: DC Disconnect Switch
  7. Section 7: AC Combiner Panel
  8. Section 8: AC Disconnect Switch
  9. Section 9: kWh Meter
  10. Section 10: Service Panel
  11. Section 11: Inverter 1
  12. Section 12: Data Acquisition System
  13. Section 13: Application Notes
  14. Section 14: Site
  15. Section 15: Electrical Checkout
  16. Section 16: AC Circuits before Turn On
  17. Section 17: Data Acquisition
ChecklistSolar Commissioning Checklist
StageQuality and trades
LaneBuilders and contractors
Sections17
Questions141
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Sep 4, 2024
PriceFree on every plan

When to use it

Use it at start-up and functional testing, with the installer present, so the readings and results are recorded once, on the day. With 141 questions, split the walk by section if you need to. Everything saves on the device, and the app counts what is still to answer.

With 17 sections, from PV Modules and Module Wiring to Data Acquisition, use the app’s Jump to section list rather than scrolling.

Who uses it

Installers use it as their own test record; the client’s engineer witnesses the tests. Project managers use the report to release the next trade; the quality file keeps it for closeout.

Before you walk it

  • Photograph the rating plate and the controls display at the time of each test.
  • Raise an action plan for each open item, so acceptance waits on a short list, not a vague one.
  • Draw a dimension line on the photo with the measure tool, so the trade sees the size of the gap, not just the word “gap”.
  • Re-inspect with the same checklist and keep both reports. Together they show the defect and the fix.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Solar Commissioning Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 17 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Does the Solar Commissioning Checklist replace the commissioning specification?

No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.

Does completing the checklist mean the work meets code?

No. The checklist records what was inspected and what was found, with photos. Code approval comes from the building inspector or the engineer of record; the report is your evidence of the checks you made.

Is the Solar Commissioning Checklist free?

Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.