Equipment Commissioning Checklist (free template)
A ready-made quality check for the moment before this work is covered: 2 sections, 47 questions, and 4 photos per question for the evidence.
Fewer items on the punch list, because they were caught at the trade.
What it covers
The Equipment Commissioning Checklist runs to 2 sections and 47 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Documentation & Requirements
- Section 2: Burner/Boiler Commissioning
When to use it
Use it at start-up and functional testing, with the installer present, so the readings and results are recorded once, on the day. 47 questions makes a thorough walk. Answers save on the device as you go, so a break in the middle loses nothing.
Its 2 sections (Documentation & Requirements and Burner/Boiler Commissioning) keep related questions together.
Who uses it
Installers use it as their own test record; the client’s engineer witnesses the tests. The report goes to the trade contractor with each defect assigned, and into the project quality file.
Before you walk it
- Photograph the rating plate and the controls display at the time of each test.
- Raise an action plan for each open item, so acceptance waits on a short list, not a vague one.
- Where the checklist asks for a reading or a measurement, type the number in. It prints in the report beside the question.
- Open an action plan on every answer that needs fixing, with a due date, so the re-check happens before the next trade arrives.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Equipment Commissioning Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.
Walk it
Work through the 2 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.
Questions people ask
Does the Equipment Commissioning Checklist replace the commissioning specification?
No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.
How does a trade contractor get their items?
Send them the PDF report. Each item carries its photos and its action plan, with the priority and the due date. A shared team workspace is on the roadmap; today the report is how the trade gets the list.
Is the Equipment Commissioning Checklist free?
Yes. Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Run the next handover as a program, not a pile of PDFs.
Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.