Sheet QT-041 · Quality and trades · Free template
Storm Damage Building Assessment Checklist (free template)
A ready-made quality check for the moment before this work is covered: 8 sections, 52 questions, and 4 photos per question for the evidence.
Fewer items on the punch list, because they were caught at the trade.
What it covers
8 sections and 52 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Site Safety - Pre-Entry Checks
- Section 2: Roof and Roof Structure
- Section 3: External Walls and Cladding
- Section 4: Windows, Doors, and Glazing
- Section 5: Internal Water Ingress
- Section 6: Structural Elements
- Section 7: Drainage and External Areas
- Section 8: Scope Summary
When to use it
Use it as the trade completes each area, so defects are fixed while the trade is still on site. At 52 questions, this is a full inspection. Set time aside for it and walk it in the checklist’s order.
The 8 sections run from Site Safety - Pre-Entry Checks to Scope Summary, and the app’s Jump to section list takes you straight to any of them.
Who uses it
Quality managers and site engineers use it at hold points; the inspector or engineer of record may ask to see it. The report goes to the trade contractor with each defect assigned, and into the project quality file.
Before you walk it
- Check again with the same checklist after the fix, so the pair of reports shows the defect and the repair.
- Photograph every cavity or connection before it is covered, even when it is right.
- Re-inspect with the same checklist and keep both reports. Together they show the defect and the fix.
- Photograph every cavity before it is closed, even when it is right. The photo of a correct install is the one you will need later.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Storm Damage Building Assessment Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.
Walk it
Work through the 8 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.
Questions people ask
Does the Storm Damage Building Assessment Checklist replace the building inspector’s visit?
No. It is your own quality check before the official inspection. Code approval comes from the inspector or the engineer of record.
How does a trade contractor get their items?
Send them the PDF report. Each item carries its photos and its action plan, with the priority and the due date. A shared team workspace is on the roadmap; today the report is how the trade gets the list.
Can I change the questions in the Storm Damage Building Assessment Checklist?
Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.