Roof Sheathing & Shear Wall Inspection Checklist (free template)

Catch it at the trade, not on the punch list: 45 questions across 5 sections, with photos of the work before it disappears behind the next trade.

Fewer items on the punch list, because they were caught at the trade.

What it covers

45 questions across 5 sections. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Permits and Plans
  2. Section 2: Exterior Wall Sheathing and Braced Wall Panel
  3. Section 3: Exterior Roof Sheathing
  4. Section 4: Hold-Downs and Hardware
  5. Section 5: Framing
ChecklistRoof Sheathing & Shear Wall Inspection Checklist
StageQuality and trades
LaneBuilders and contractors
Sections5
Questions45
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Oct 26, 2023
PriceFree on every plan

When to use it

Use it at the hold point, before the work is covered by the next trade. 45 questions makes a thorough walk. Answers save on the device as you go, so a break in the middle loses nothing.

5 sections, from Permits and Plans through to Framing. The app shows the page you are on and how many are left as you go. Property managers use it too, for the same job across their buildings.

Who uses it

Superintendents, quality managers and trade foremen complete it; the trade contractor owns the defects. The report goes to the trade contractor with each defect assigned, and into the project quality file.

Before you walk it

  • Use the measure tool to show spacing, cover or gaps on the photo.
  • Check again with the same checklist after the fix, so the pair of reports shows the defect and the repair.
  • Where the checklist asks for a reading or a measurement, type the number in. It prints in the report beside the question.
  • Open an action plan on every answer that needs fixing, with a due date, so the re-check happens before the next trade arrives.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Roof Sheathing & Shear Wall Inspection Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 5 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Does the Roof Sheathing & Shear Wall Inspection Checklist replace the building inspector’s visit?

No. It is your own quality check before the official inspection. Code approval comes from the inspector or the engineer of record.

How does a trade contractor get their items?

Send them the PDF report. Each item carries its photos and its action plan, with the priority and the due date. A shared team workspace is on the roadmap; today the report is how the trade gets the list.

Can I change the questions in the Roof Sheathing & Shear Wall Inspection Checklist?

Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.

Start freeon iPhone and iPad
Start freeon iPhone and iPad