Sheet QT-038 · Quality and trades · Free template
Roof Inspection Checklist (free template)
47 questions across 7 sections, so every inspector checks the same things at the same hold point, whoever is on site that day.
Fewer items on the punch list, because they were caught at the trade.
What it covers
7 sections and 47 questions, in the order you walk them. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: General Roof Conditions
- Section 2: Flat / Membrane Roof
- Section 3: Sloped Roof
- Section 4: Roof Features Condition
- Section 5: Ceiling Conditions
- Section 6: Exterior Wall Surfaces
- Section 7: Interior Wall Surfaces
When to use it
Use it before the inspector’s visit, so the inspection finds nothing you hadn’t already found. At 47 questions, this is a full inspection. Set time aside for it and walk it in the checklist’s order.
7 sections, from General Roof Conditions through to Interior Wall Surfaces. The app shows the page you are on and how many are left as you go.
Who uses it
Superintendents, quality managers and trade foremen complete it; the trade contractor owns the defects. When a client or inspector asks what is behind a finished wall, the photos from this check are the answer.
Before you walk it
- Check again with the same checklist after the fix, so the pair of reports shows the defect and the repair.
- Photograph every cavity or connection before it is covered, even when it is right.
- Agree the hold points with each trade at the start, so nobody covers work that hasn’t been checked.
- Where the checklist asks for a reading or a measurement, type the number in. It prints in the report beside the question.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the Roof Inspection Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.
Walk it
Work through the 7 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.
Questions people ask
Does the Roof Inspection Checklist replace the building inspector’s visit?
No. It is your own quality check before the official inspection. Code approval comes from the inspector or the engineer of record.
Does completing the checklist mean the work meets code?
No. The checklist records what was inspected and what was found, with photos. Code approval comes from the building inspector or the engineer of record; the report is your evidence of the checks you made.
Does the Roof Inspection Checklist work offline?
Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.
Run the next handover as a program, not a pile of PDFs.
Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.