Sheet QT-015 · Quality and trades · Free template

Electrical Safety Checklist for Construction Sites (free template)

A hold-point record for this work: 10 sections, 68 questions, and a signed PDF the next trade can be released against.

Fewer items on the punch list, because they were caught at the trade.

What it covers

68 questions across 10 sections. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Documentation and Program Requirements
  2. Section 2: Temporary Power Distribution
  3. Section 3: Temporary Wiring and Extension Cords
  4. Section 4: Portable Electric Tools and Equipment
  5. Section 5: Temporary Lighting
  6. Section 6: Wet and Damp Location Protection
  7. Section 7: Overhead Power Line Clearances
  8. Section 8: Underground Utilities
  9. Section 9: LockoutTagout on Construction Sites
  10. Section 10: Electrical PPE and Worker Safety
ChecklistElectrical Safety Checklist for Construction Sites
StageQuality and trades
LaneBuilders and contractors
Sections10
Questions68
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Jun 15, 2026
PriceFree on every plan

When to use it

Use it at the hold point, before the work is covered by the next trade. With 68 questions, it is worth doing properly once rather than quickly twice: walk it in order and photograph as you go.

10 sections, from Documentation and Program Requirements through to Electrical PPE and Worker Safety. The app shows the page you are on and how many are left as you go.

Who uses it

Superintendents, quality managers and trade foremen complete it; the trade contractor owns the defects. Project managers use the report to release the next trade; the quality file keeps it for closeout.

Before you walk it

  • Use the measure tool to show spacing, cover or gaps on the photo.
  • Check again with the same checklist after the fix, so the pair of reports shows the defect and the repair.
  • Photograph every cavity before it is closed, even when it is right. The photo of a correct install is the one you will need later.
  • Agree the hold points with each trade at the start, so nobody covers work that hasn’t been checked.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Electrical Safety Checklist for Construction Sites in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 10 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Does the Electrical Safety Checklist for Construction Sites replace the building inspector’s visit?

No. It is your own quality check before the official inspection. Code approval comes from the inspector or the engineer of record.

Does completing the checklist mean the work meets code?

No. The checklist records what was inspected and what was found, with photos. Code approval comes from the building inspector or the engineer of record; the report is your evidence of the checks you made.

Can I change the questions in the Electrical Safety Checklist for Construction Sites?

Not today: checklists from the library can’t be edited on the device. Use the note on each question, and the issues list with photos, for anything the checklist doesn’t ask.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.