Sheet QT-043 · Quality and trades · Free template

Substation Commissioning Checklist (free template)

71 questions across 15 sections, so every inspector checks the same things at the same hold point, whoever is on site that day.

Fewer items on the punch list, because they were caught at the trade.

What it covers

The Substation Commissioning Checklist runs to 15 sections and 71 questions. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.

  1. Section 1: Transformers/Motors
  2. Section 2: Earth
  3. Section 3: Direct Current (D.C.) Battery System
  4. Section 4: Operation and Testing Tools and Equipment
  5. Section 5: Safety Precaution
  6. Section 6: Testing
  7. Section 7: Lightning Protection System
  8. Section 8: Circuitry Check
  9. Section 9: Charger and Battery Set
  10. Section 10: Luminaires and Lighting Fittings
  11. Section 11: Lighting Control (On/Off and Dimming)
  12. Section 12: Lighting Measurement
  13. Section 13: Digital Multifunction Power Meter
  14. Section 14: Digital Power Analyzer
  15. Section 15: Busbar Trunking System
ChecklistSubstation Commissioning Checklist
StageQuality and trades
LaneBuilders and contractors
Sections15
Questions71
Photos per question4
Sign-offAuditorSignature on the report cover
RevisionVersion 1, Sep 4, 2024
PriceFree on every plan

When to use it

Use it after a replacement or major repair, before the system goes back into service. With 71 questions, it is worth doing properly once rather than quickly twice: walk it in order and photograph as you go.

15 sections cover a lot of ground, from Transformers/Motors to Busbar Trunking System. Walk them in order, or jump to the one you are standing in.

Who uses it

Commissioning agents, MEP contractors and the installer’s engineers complete it; the owner’s team and the facilities manager receive it. When a client or inspector asks what is behind a finished wall, the photos from this check are the answer.

Before you walk it

  • Raise an action plan for each open item, so acceptance waits on a short list, not a vague one.
  • Type readings into the number answers where the checklist asks, so the report shows the values, not just a tick.
  • Where the checklist asks for a reading or a measurement, type the number in. It prints in the report beside the question.
  • Open an action plan on every answer that needs fixing, with a due date, so the re-check happens before the next trade arrives.

How it works in the app

Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.

  1. Pick it

    Search for the Substation Commissioning Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.

  2. Walk it

    Work through the 15 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.

  3. Photograph it

    Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.

  4. Assign it

    Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.

  5. Report it

    Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.

Use this checklist free in the app

Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.

Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.

Questions people ask

Does the Substation Commissioning Checklist replace the commissioning specification?

No. Follow the specification and the manufacturer’s procedure. The checklist is the structured record of what was tested and found, with photos and readings.

Does completing the checklist mean the work meets code?

No. The checklist records what was inspected and what was found, with photos. Code approval comes from the building inspector or the engineer of record; the report is your evidence of the checks you made.

Does the Substation Commissioning Checklist work offline?

Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.

Run the next handover as a program, not a pile of PDFs.

Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.