A ready-made quality check for the moment before this work is covered: 25 sections, 288 questions, and 4 photos per question for the evidence.
Fewer items on the punch list, because they were caught at the trade.
What it covers
288 questions across 25 sections. Each question takes up to 4 photos and a note, so the evidence sits beside the answer it supports. The section names are below; the questions themselves are in the app.
- Section 1: Administrative Requirements
- Section 2: General Safety and Health Provisions
- Section 3: Personal Protective and Life Saving Equipment
- Section 4: Fire Protection
- Section 5: Signs, Signals and Barricades
- Section 6: Comments Materials Handling, Storage, Use, and Disposal
- Section 7: Tools, Hand, and Power
- Section 8: Welding and Cutting
- Section 9: Electrical
- Section 10: Scaffolding
- Section 11: Fall Protection > 6 Feet
- Section 12: Cranes and Derricks
- Section 13: Hoists and Elevators
- Section 14: Conveyors
- Section 15: Motor Vehicles, Mechanized Equipment, and Marine Operations
- Section 16: Excavations
- Section 17: Concrete, and Masonry Construction
- Section 18: Steel Erection
- Section 19: Underground Construction, Caissons, Cofferdams, and…
- Section 20: Demolition
- Section 21: Blasting and Use of Explosives
- Section 22: Power Transmission and Distribution
- Section 23: Rollover Protective Structures (ROPS); Overhead Protection
- Section 24: Stairways and Ladders
- Section 25: Comments Toxic and Hazardous Substances
When to use it
Use it before an external inspection or audit, so the findings are yours first. At 288 questions, this is a major inspection, best planned as its own visit. Answers save on the device as you go, so you can stop and pick it up again.
With 25 sections, from Administrative Requirements to Comments Toxic and Hazardous Substances, use the app’s Jump to section list rather than scrolling.
Who uses it
Safety advisers and supervisors walk it; the teams it covers fix what it finds. The report goes to the trade contractor with each defect assigned, and into the project quality file.
Before you walk it
- Open an action plan for every hazard before you move on.
- Walk the area again with the same checklist when the actions are due.
- Where the checklist asks for a reading or a measurement, type the number in. It prints in the report beside the question.
- Open an action plan on every answer that needs fixing, with a due date, so the re-check happens before the next trade arrives.
How it works in the app
Five steps from an empty project to a signed report. The checklist is the same for everyone; the evidence is yours.
Pick it
Search for the OSHA Construction Inspection Checklist in the Easy Site Audit app and add it to a project: usually a job, a building or an area. Adding needs a connection; after that it works offline.
Walk it
Work through the 25 sections in order, or jump straight to the one you are standing in. Tap Yes, No or N/A, or type a number or a written answer where the question asks, and the app counts what is still to answer.
Photograph it
Add up to 4 photos to any question, from the camera or the photo library, with a note of what you saw. The photos print under the question they belong to.
Assign it
Where an answer needs action, open an action plan: what needs fixing, who owns it (picked from your contacts), the priority and a due date, seven days out unless you change it.
Report it
Finish with one A4 PDF: your logo, each section with how much of it was answered, the photos, notes and action plans, and your signature on the cover. No watermark, on any plan.
Use this checklist free in the app
Checklists are free to browse, add and fill in on every plan, including the free plan. Only cloud upload of checklist answers needs Pro.
Running handovers across several projects? Book a demo and see how a team runs these checklists as one inspection program.
Questions people ask
Does completing the checklist mean the work meets code?
No. The checklist records what was inspected and what was found, with photos. Code approval comes from the building inspector or the engineer of record; the report is your evidence of the checks you made.
How does a trade contractor get their items?
Send them the PDF report. Each item carries its photos and its action plan, with the priority and the due date. A shared team workspace is on the roadmap; today the report is how the trade gets the list.
Does the OSHA Construction Inspection Checklist work offline?
Yes. Add it once with a connection; after that, answering, photos and the PDF report all work with no signal. Sync when you are back online.
Run the next handover as a program, not a pile of PDFs.
Pick the checklist, walk it, give every item an owner and send the signed report before you leave the site.